
BARIŞ TECHNOLOGİCAL INSTALLATİON
SMOKE TUBE AND WATER TUBE STEAM GENERATORS
Ideal solution for plants that need low capacity and quick steam production. Three pass, high efficient steam generators up to 5 t/h steam capacity. Smoke tube and water tube constructions
ÖNER SEPARATOR

TECNOLOGICAL ONE TOUCH A DESING SOLUTION
TECNOLOGICAL ONE TOUCH A DESING SOLUTION
MAZLUM STEEL PIPES

The rock shoe prevents damage to the pile during pile driving in rocky ground.
Outside Diameter : 711,2mm
Wall Thickness : 14,2 mm
Per Pile Length : 25 Meters
MAZLUM STEEL PIPES

QUALITY CONTROL
XRAY and RT Test Line
Hydrostatic Tests
BARIŞ TECHNOLOGİCAL INSTALLATİON

Deaeration is the process of removing the dissolved oxygen from the boiler feedwater. Additionally, in the deaeration process, the CO2 is also removed. Removal of these two gases is important in
BARIŞ TECHNOLOGİCAL INSTALLATİON

Solid / liquid / gas and biogas fuel options, High efficiency, low thermal losses, Perfect design for optimal heat transfer and flue gas pressure drop, Low NOx formation with 3-pass design and large combustion
BARIŞ TECHNOLOGİCAL INSTALLATİON

Solid / liquid / gas and biogas fuel options, High efficiency, low thermal losses, Perfect design for optimal heat transfer and oil/flue gas pressure drop
BARIŞ TECHNOLOGİCAL INSTALLATİON

COGENERATION - TRIGENERATION SYSTEMS
Cogeneration or combined heat and power (CHP) is the simultaneous production of electricity with the recovery and utilization of waste heat. Cogeneration is a highly efficient form of
BARIŞ TECHNOLOGİCAL INSTALLATİON

Waste heat boilers for hot water, Steam, Superheated steam, Thermal oil, and hot air production, Smoketube and watertube constructions, Custom designed solutions according to waste heat and site conditions