BARIŞ TECHNOLOGİCAL INSTALLATİON
Length is possible up to 12 mt (40 ‘). Easy transportation is available because of the compact frame. Sound insulation is possible at the desired level.Thermal insulation is possible at the desired level
MAZLUM STEEL PIPES
Potable Water Pipes with Epoxy Coating. Outside Diameter : 1016mm / Wall Thickness : 10mm / Pipe Length :13.50 Meters / Steel Grade : S355JR
BARIŞ TECHNOLOGİCAL INSTALLATİON
Waste heat boilers for hot water, Steam, Superheated steam, Thermal oil, and hot air production, Smoketube and watertube constructions, Custom designed solutions according to waste heat and site conditions
BARIŞ TECHNOLOGİCAL INSTALLATİON
Solid / liquid / gas and biogas fuel options, High efficiency, low thermal losses, Perfect design for optimal heat transfer and flue gas pressure drop, Low NOx formation with 3-pass design and large combustion
BARIŞ TECHNOLOGİCAL INSTALLATİON
Small-sized, small-capacity ENERKON Electrical Steam Generators are perfect for industries that require quick, efficient, and high-quality steam in laboratories, hospitals..
MAZLUM STEEL PIPES
The rock shoe prevents damage to the pile during pile driving in rocky ground.
Outside Diameter : 711,2mm
Wall Thickness : 14,2 mm
Per Pile Length : 25 Meters
MAZLUM STEEL PIPES
Internal Sa2 ½ sandblasting. Sandblasting is very neccessary for surface preparation for steel pipes. All surfaces must be thoroughly clean, dry, sound and free from grease, oils, waxes and all loose materials.