The rock shoe prevents damage to the pile during pile driving in rocky ground.
Outside Diameter : 711,2mm
Wall Thickness : 14,2 mm
Per Pile Length : 25 Meters
BARIŞ TECHNOLOGİCAL INSTALLATİON
Solid / liquid / gas and biogas fuel options, High efficiency, low thermal losses, Perfect design for optimal heat transfer and flue gas pressure drop, Low NOx formation with 3-pass design and large combustion
BARIŞ TECHNOLOGİCAL INSTALLATİON
ECONOMIZERS AND AIR PREHEATERS
Engineering according to fuel and application specifications, Perfect design for optimal heat transfer and water/flue gas pressure drop, Delivery with all auxiliary equipments (Optional)
BARIŞ TECHNOLOGİCAL INSTALLATİON
Provides efficient and economical solutions for processes that need dry steam, Provides efficient separation with centrifugal effect, Needs no maintenance due to having no moving part
Withstands unfavorable conditions and water hammer
ÖNER SEPARATOR
PASTEURİZATİON COMPACT SYSTEM 15.000 LT-H
Pasteurization Compact System 15.000 LT-H
BARIŞ TECHNOLOGİCAL INSTALLATİON
Indirect steam generators can be used instead of a steam boiler in plants where a sufficient heating system exists. Less space requirement due to packaged construction, Low-pressure fluctuations due to large steam and water volume
MAZLUM STEEL PIPES
Tubular Piles with Clutch Welding.
Materials : E22 Clutch
Material Steel Grade : API 5L X60 PSL1
Manufacturing Standards : ASTM A252
MAZLUM STEEL PIPES
Internal Sa2 ½ sandblasting. Sandblasting is very neccessary for surface preparation for steel pipes. All surfaces must be thoroughly clean, dry, sound and free from grease, oils, waxes and all loose materials.
MAZLUM STEEL PIPES
QUALITY CONTROL
XRAY and RT Test Line
Hydrostatic Tests
BARIŞ TECHNOLOGİCAL INSTALLATİON
Deaeration is the process of removing the dissolved oxygen from the boiler feedwater. Additionally, in the deaeration process, the CO2 is also removed. Removal of these two gases is important in