MAZLUM STEEL PIPES
The rock shoe prevents damage to the pile during pile driving in rocky ground.
Outside Diameter : 711,2mm
Wall Thickness : 14,2 mm
Per Pile Length : 25 Meters
ÖNER SEPARATOR
TECNOLOGICAL ONE TOUCH A DESING SOLUTION
TECNOLOGICAL ONE TOUCH A DESING SOLUTION
BARIŞ TECHNOLOGİCAL INSTALLATİON
COGENERATION - TRIGENERATION SYSTEMS
Cogeneration or combined heat and power (CHP) is the simultaneous production of electricity with the recovery and utilization of waste heat. Cogeneration is a highly efficient form of
BARIŞ TECHNOLOGİCAL INSTALLATİON
Small-sized, small-capacity ENERKON Electrical Steam Generators are perfect for industries that require quick, efficient, and high-quality steam in laboratories, hospitals..
BARIŞ TECHNOLOGİCAL INSTALLATİON
Industrial stacks suitable for solid, liquid, and gaseous fuels, Design and manufacturing in accordance with TS EN 13084, Custom designed solutions for special site and flue conditions, Easy erection due to modular design
MAZLUM STEEL PIPES
Internal Sa2 ½ sandblasting. Sandblasting is very neccessary for surface preparation for steel pipes. All surfaces must be thoroughly clean, dry, sound and free from grease, oils, waxes and all loose materials.
BARIŞ TECHNOLOGİCAL INSTALLATİON
Solid / liquid / gas and biogas fuel options, High efficiency, low thermal losses, Perfect design for optimal heat transfer and oil/flue gas pressure drop
MAZLUM STEEL PIPES
Tubular Piles with Clutch Welding.
Materials : E22 Clutch
Material Steel Grade : API 5L X60 PSL1
Manufacturing Standards : ASTM A252
BARIŞ TECHNOLOGİCAL INSTALLATİON
ECONOMIZERS AND AIR PREHEATERS
Engineering according to fuel and application specifications, Perfect design for optimal heat transfer and water/flue gas pressure drop, Delivery with all auxiliary equipments (Optional)