BARIŞ TECHNOLOGİCAL INSTALLATİON
Deaeration is the process of removing the dissolved oxygen from the boiler feedwater. Additionally, in the deaeration process, the CO2 is also removed. Removal of these two gases is important in
MAZLUM STEEL PIPES
Potable Water Pipes with Epoxy Coating. Outside Diameter : 1016mm / Wall Thickness : 10mm / Pipe Length :13.50 Meters / Steel Grade : S355JR
BARIŞ TECHNOLOGİCAL INSTALLATİON
Waste heat boilers for hot water, Steam, Superheated steam, Thermal oil, and hot air production, Smoketube and watertube constructions, Custom designed solutions according to waste heat and site conditions
BARIŞ TECHNOLOGİCAL INSTALLATİON
Direct hot water production from cold water, Design and production for oil and gas fuels, Completely hot galvanized or stainess steel production, Seconder heating system is not necessary (Steam, Hot water)
BARIŞ TECHNOLOGİCAL INSTALLATİON
Solid / liquid / gas and biogas fuel options, High efficiency, low thermal losses, Perfect design for optimal heat transfer and flue gas pressure drop, Low NOx formation with 3-pass design and large combustion
BARIŞ TECHNOLOGİCAL INSTALLATİON
ECONOMIZERS AND AIR PREHEATERS
Engineering according to fuel and application specifications, Perfect design for optimal heat transfer and water/flue gas pressure drop, Delivery with all auxiliary equipments (Optional)
MAZLUM STEEL PIPES
The rock shoe prevents damage to the pile during pile driving in rocky ground.
Outside Diameter : 711,2mm
Wall Thickness : 14,2 mm
Per Pile Length : 25 Meters
MAZLUM STEEL PIPES
QUALITY CONTROL
XRAY and RT Test Line
Hydrostatic Tests









