
MAZLUM STEEL PIPES

The rock shoe prevents damage to the pile during pile driving in rocky ground.
Outside Diameter : 711,2mm
Wall Thickness : 14,2 mm
Per Pile Length : 25 Meters
BARIŞ TECHNOLOGİCAL INSTALLATİON

Length is possible up to 12 mt (40 ‘). Easy transportation is available because of the compact frame. Sound insulation is possible at the desired level.Thermal insulation is possible at the desired level
MAZLUM STEEL PIPES

QUALITY CONTROL
XRAY and RT Test Line
Hydrostatic Tests
BARIŞ TECHNOLOGİCAL INSTALLATİON

Solid / liquid / gas and biogas fuel options, High efficiency, low thermal losses, Perfect design for optimal heat transfer and flue gas pressure drop, Low NOx formation with 3-pass design and large combustion chamber
BARIŞ TECHNOLOGİCAL INSTALLATİON

Solid / liquid / gas and biogas fuel options, High efficiency, low thermal losses, Perfect design for optimal heat transfer and flue gas pressure drop, Low NOx formation with 3-pass design and large combustion
BARIŞ TECHNOLOGİCAL INSTALLATİON

COGENERATION - TRIGENERATION SYSTEMS
Cogeneration or combined heat and power (CHP) is the simultaneous production of electricity with the recovery and utilization of waste heat. Cogeneration is a highly efficient form of
BARIŞ TECHNOLOGİCAL INSTALLATİON

Small-sized, small-capacity ENERKON Electrical Steam Generators are perfect for industries that require quick, efficient, and high-quality steam in laboratories, hospitals..